Proposed Road Connections Project
ROW/Acquisition
March 2023
Design 30/60
June 2023
Final Plan Review 90
December 2023
Construction
July 2025
The purpose of this proposed project is to connect existing roadways with missing sections as part of the adopted Comprehensive Transportation Plan, which will allow for faster response time for Fires and EMS in case of an emergency, as well as alternate routes for traffic due to better connectivity.
The following locations are being considered for this project:
South Allen (Middle Bridge Rd to Quail Ave) - 0.02 miles
Song Sparrow Road (Trawden Dr. to Redstart Ct.) - 0.02 miles
Pineview Drive (Woodland Dr. to Dacus Pl.) - 0.15 miles
S. Wingate St. (W. Holding Ave to Kinvara Ct.) - 0.04 miles
N. Wingate St. (W. Pine Ave. to W. Juniper Ave.) - 0.21 miles