The Town of Wake Forest owns and maintains E Juniper Ave. The existing street has approximately 428 linear feet from N Main Street to Cul-De-Sac. Approximately, the street has 20 ft of width, and the length of the street are 200 linear feet of asphalt pavement and approximately 228 ft of gravel street.

Project Description

The objective of this contract is to resurface the existing asphalt pavement and to relay asphalt to the existing gravel street section to the cul-del-sac.

Scheduled to begin at the end of October 2023, the project is expected to conclude by the end of November 2023. 

 

 

Project Leaders

Steve Meyer, CIP Manager
919-435-9510

Min Htun, Engineer
919-435-9446