Proposed Road Connections Project
- March 2023ROW/Acquisition
- June 2023Design 30/60
- December 2023Final Plan Review 90
- July 2025Construction
The purpose of this proposed project is to connect existing roadways with missing sections as part of the adopted Comprehensive Transportation Plan, which will allow for faster response time for Fires and EMS in case of an emergency, as well as alternate routes for traffic due to better connectivity.
The following locations are being considered for this project:
South Allen (Middle Bridge Rd to Quail Ave) - 0.02 miles
Song Sparrow Road (Trawden Dr. to Redstart Ct.) - 0.02 miles
Pineview Drive (Woodland Dr. to Dacus Pl.) - 0.15 miles
S. Wingate St. (W. Holding Ave to Kinvara Ct.) - 0.04 miles
N. Wingate St. (W. Pine Ave. to W. Juniper Ave.) - 0.21 miles